EcoCore
Explore an elevated standard for data center efficiency, cost savings, and sustainability.


Rob Dunn
/
CEO of Start Campus
EcoCore
The Foundation for Next-Generation Data Centers


Harness Sustainability
Nautilus’ zero-water technology redefines efficiency.
Scale with Ease
Hyperscale data center expansion possible with 2.5MW Blocks.
Speed Up Deployment
EcoCore units are 60% factory-made for speed and fewer onsite errors.
Cool with Precision
Optimize temperature control in high-density areas using tailored cooling strategies.
Cooling Distribution Unit – COOL2500
Four parallel CDU units, each capable of delivering up to 833kW of heat rejection, ensuring optimal temperature control for the data center. Nautilus’ zero-water cooling technology makes it possible.
Primary Electrical Unit – PWR-LV-2500
Provides a robust 1250 kW of 415V 3-phase power distribution, ensuring uninterrupted performance for critical systems.
Reserve Power Unit – RES-LV-1250
Offers 1250kW of reserve power, configured in N+1 redundancy for dependable, seamless operation.
Aisle – AISLE-HT
Designed to accommodate a customized IT cooling solution, ensuring the data center operates at its best efficiency.
Aisle – AISLE-CL (Accessory)
Optimizes space for data center needs because of its construction on an interstitial structure and accessory space in the MEP.







Download the Full Product Data Sheet Now
Integrate EcoCore into Your Data Center
We invite you to think differently about how your data center’s infrastructure will function. There is a better way.
You have a site in mind
You need a data center site
Calculate your data center needs
Slide the scale to compare data center sizes

Enhance Your Existing Data Center Project
With EcoCore Cooling
Have you already started your data center process or selected a site? Curious to learn whether you can implement EcoCore infrastructure cooling system? We make it easy.
Fast-Forward Your Data Center Launch
Vetted Sites
MARSEILLE, FRANCE
- Water quality assessment study
- Lease
- Regulatory and permitting matrix with estimated cost and schedule
- Critical IT load
- Data center size
- Power and fiber availability & connection studies resulting in contingent agreements
- Conceptual site layout
MILLINOCKET, ME, USA
100+MW Critical Load Capacity
1.15 PUE Guaranteed
- Water quality assessment study
- Lease
- Regulatory and permitting matrix with estimated cost and schedule
- Critical IT load
- Data center size
- Power and fiber availability & connection studies resulting in contingent agreements
- Conceptual site layout
LIMERICK, IRELAND
7.5MW Critical Load Capacity
1.15 PUE Guaranteed
- Water quality assessment study
- Lease
- Regulatory and permitting matrix with estimated cost and schedule
- Critical IT load
- Data center size
- Power and fiber availability & connection studies resulting in contingent agreements
- Conceptual site layout