EcoCore

EcoCore delivers data center infrastructure that is sustainable by design, with high-efficiency cooling in prefabricated units, reducing environmental impact and operational costs.

Explore an elevated standard for data center efficiency, cost savings, and sustainability.
“Using partners such as Nautilus, we can fully leverage the cooling power of the Atlantic Ocean. This means we can scale up without having to introduce chillers, cooling towers and less sustainable technologies.”

Rob Dunn

/

CEO of Start Campus

EcoCore

The Foundation for Next-Generation Data Centers

EcoCore is a foundational infrastructure solution tailored for data centers with an initial offering of 2500kW (2.5MW), offering seamless expansion capabilities to meet hyperscale demands. The comprehensive system and its modular design allows for sizing and scaling EcoCore to accommodate your specific design from the outset.
EcoCore enhances prefabrication efficiency and streamlines the construction process by seamlessly integrating the white space with the grey space and strategically positioning MEP components above. The next-generation data center solution’s versatility extends to cooling, with EcoCore natively supporting everything from traditional hot aisle to advanced liquid cooling systems, empowering the most intensive AI and ML workloads.

Harness Sustainability

Nautilus’ zero-water technology redefines efficiency.

Scale with Ease

Hyperscale data center expansion possible with 2.5MW Blocks.

Speed Up Deployment

EcoCore units are 60% factory-made for speed and fewer onsite errors.

Cool with Precision

Optimize temperature control in high-density areas using tailored cooling strategies.

Choose EcoCore and embrace a solution that accelerates market entry, expands new data center location possibilities, and eschews harmful substances, setting new standards for energy and performance excellence. EcoCore is the smart, sustainable future of data center construction.

Cooling Distribution Unit – COOL2500

Four parallel CDU units, each capable of delivering up to 833kW of heat rejection, ensuring optimal temperature control for the data center. Nautilus’ zero-water cooling technology makes it possible.

Primary Electrical Unit – PWR-LV-2500

Provides a robust 1250 kW of 415V 3-phase power distribution, ensuring uninterrupted performance for critical systems.

Reserve Power Unit – RES-LV-1250

Offers 1250kW of reserve power, configured in N+1 redundancy for dependable, seamless operation.

Aisle – AISLE-HT

Designed to accommodate a customized IT cooling solution, ensuring the data center operates at its best efficiency.

Aisle – AISLE-CL (Accessory)

Optimizes space for data center needs because of its construction on an interstitial structure and accessory space in the MEP. 

Download the Full Product Data Sheet Now

Integrate EcoCore into Your Data Center

We invite you to think differently about how your data center’s infrastructure will function. There is a better way.

You have a site in mind

You know what’s right for your business needs, employees, and clientele. Let’s connect, and we’ll ensure your chosen site is perfectly compatible with EcoCore specifications.

You need a data center site

We have pre-identified data center sites available world-wide, or we can assist in finding a location that suits your business objectives in a market of your choice.

Calculate your data center needs

Slide the scale to compare data center sizes

10MW
Shipping Splits
0
Compared to 300
Water Savings
0
Million Liters
Cooling Distribution Unit
0 Units
PWR-LV-1250
0 Units
AISLE-HT
0 Units
RES-LV-1250
0 Units
AISLE-CL
0 Units
PRIME-LOOP
0 Sets

Enhance Your Existing Data Center Project

With EcoCore Cooling

Have you already started your data center process or selected a site? Curious to learn whether you can implement EcoCore infrastructure cooling system? We make it easy. 

Fast-Forward Your Data Center Launch

Vetted Sites

With our vetted sites, your facility can launch much faster and consume a smaller footprint with fewer materials across every dimension without sacrificing MW capacity or sustainability goals.
20MW Critical Load Capacity 1.15 PUE Guaranteed
  • Water quality assessment study
  • Lease
  • Regulatory and permitting matrix with estimated cost and schedule
  • Critical IT load
  • Data center size
  • Power and fiber availability & connection studies resulting in contingent agreements
  • Conceptual site layout

100+MW Critical Load Capacity
1.15 PUE Guaranteed

  • Water quality assessment study
  • Lease
  • Regulatory and permitting matrix with estimated cost and schedule
  • Critical IT load
  • Data center size
  • Power and fiber availability & connection studies resulting in contingent agreements
  • Conceptual site layout

7.5MW Critical Load Capacity
1.15 PUE Guaranteed

  • Water quality assessment study
  • Lease
  • Regulatory and permitting matrix with estimated cost and schedule
  • Critical IT load
  • Data center size
  • Power and fiber availability & connection studies resulting in contingent agreements
  • Conceptual site layout

Vetted Sites

High Performance, Simple Process

We did the heavy lifting so you could engage in a seamless data center launch in less time with a minimal environmental footprint and fewer materials across every dimension. Ready to increase capacity and exceed sustainability goals?
Scroll to Top